Electricity equip Acer connector "550" mikawat

2017-05-09 at 10:21


Baghdad scales news


The electricity Ministry announced Tuesday, the processing of the left side of Mosul 550 "mikawat of electrical energy.

Prime spokesman Musab teacher at statement/balance of news/copy, that "engineering and technical staffs in Mew managed to equip the left side of the city of Mosul by 550 mikawat of electrical power, after running the second major station converted East of Mosul (400 KB), by cadres of the electricity transmission Department North region, stating," it was also manufacturing plant East of Mosul (132 KB) and return it to service.

The teacher said, that "the Ministry is working hard to add production capacity and increase capacity in manufacturing plants entered one after the other after the service interruptions due to acts of terrorism and sabotage that affected, besides the rehabilitation of distribution networks to ensure delivery of these energies to Mosul and Nineveh province and districts to ensure their return to their home areas."

Link