Governor of Basra: granting powers to the Resident Engineer's Department to accelerate the implementation of projects

2016/12/12 17:49


[In Baghdad]


In magdalnsaraui, the Governor of Basra give all authority to the Resident Engineer's Department to accelerate the implementation and revision service projects and construction in the province.

This came during a meeting Sunday with Nasraoui, directors of departments in planning engagements Basra resident engineer services for new projects and newly announced and companies.

Governor of Basra welcomed a statement for each agency receives Iraq library [where] a copy, "attendees during the meeting discuss the mechanism and resident engineer and service according to the controls and the correct rules for projects away from the grim routine and caused the delay of the projects.

It added that "after the new mechanism detailed talk by concerned conservative face to give all power to the Resident Engineer's Department including deletion and development and advance procedures without interference from Chambers and departments including the recipient service as represented in the circle of the resident engineer.

Governor of Basra also confirmed by the statement "on the quality and quality of work according to the terms of the contract with the companies and abide by the controls mentioned in statements without diminishing them, n add all areas not covered in infrastructure projects to the city centre and on its rolls and setting circles as directed by the Governor.

And anyone who has seen "the Directorate of Basra streams exit font file transporting heavy water and raise any obstacles to cover all areas of the Centre and in case of impediments to any of the lines are lifted by his people, and the work of the resident engineer stationed ground services for projects and setting up".

With respect to street level, the statement pointed out that the Governor of Basra "is studied by the resident engineer on the resolution to be the least damaging to the citizen specifically for the overthrow, areas with sewage and municipal Directorate tasked with preparing disclosures 74 and 76 regions, internal security and coverage areas mentioned services and infrastructure and submitted to the Planning Department.

Wolf said "communication circles resident engineer with the Directorate of government contracts exclusively and that includes new projects only, in the event of a project stops stops ratios companies in three months."

And in hard times, the Directorate prepared Basra municipality alkerber includes slip walmkorns starts from alczish city bridge through the bridge the connection down to street with Zubair, and in case of non-streets msholh infrastructure work is inserted into the adjacent projects slips and implemented the same companies.

It was also decided during the meeting change head resident engineer to complete the infrastructure project for alternative would be the tax collector Division engineered beautiful tones as the book the Directorate of municipality of Basra. "


Link