Industry proceed with the implementation of contracts with electricity and declare processed B2000 Electric transferred
8/20/2015
0 Comments

Picture
The Ministry of Industry and Minerals, on Wednesday, to embrace the implementation of contracts with the Ministry of Electricity for processing electrical transformers, while confirming the first batch of distribution transformers delivery. The Ministry of Industry and Minerals in a statement received (long-Presse) a copy of it, she "began to execute these contracts with the Ministry of Electricity for processing electrical transformers having delivered the first batch of distribution power transformers (400) to any transfer of 0.4 / 11 to the Ministry of Electricity" . The ministry added that "Diyala State Company for Electrical Industries had contracts for the processing of the ministry mentioned about (5700) transformed since handed over the first installment, amounting to (2000) and converted them by (260) converted a day." The ministry noted that "Diyala company with technical and engineering potential of high-qualify for the implementation of contracts concluded with the Ministry of Electricity period may be less than the period specified in the contracts, amounting to a full year from the date of signature."
Ministry of Industry and confirmed that "the production lines of the company is equipped with the latest machinery and equipment, imported from the best global origins specialized in this area contributes to the increase of production in quantity and quality and speed in the implementation of contracts concluded by the Ministry with the Ministry of Electricity and other sectors in record times."

The Ministry of Electricity announced (July 29, 2015), direct the Ministry of Oil processing plants agreed with fuel, while heralded that the processing time will see "significant improvement" in Baghdad and the provinces up for more than 12 hours a day, it confirmed that it will begin "immediately" to implement Prime Minister's decision to raise exceptions for all state departments.

The Ministry of Electricity announced, on Tuesday, (July 28 from the current 2015), the approval of the Ministry of Oil on the processing of five thousand tons of kerosene oil per day, expected to contribute to increasing the hours of processing of the capital Baghdad and several provinces.

The electricity minister, Qassim al-Fahdawi, pledged on Sunday (26th of July 2015), to resign if he fails to solve the electricity crisis that the country complaining about them for decades.

Iraq has suffered a shortage of electricity since the beginning of the year 1990, and increased hours of rationing electricity after the year 2003, in Baghdad and the provinces, because made a lot of stations as well as sabotage attacks on its facilities over the past years, with increased hours of power cuts for citizens to about twenty hours per day, as witnessed during the last term significant improvement as continued operating hours to about 23 hours, especially after the low temperatures.

https://translate.google.com/translate?depth=1&hl=en&rurl=translate.google.com&sandbox=0&sl=auto&tl=en&u=https://www.almadapress.com/ar/news/54172/%25D8%25A7%25D9%2584%25D8%25B5%25D9%2586%25D8%25A7 %25D8%25B9%25D8%25A9-%25D8%25AA%25D8%25A8%25D8%25A7%25D8%25B4%25D8%25B1-%25D8%25A8%25D8%25AA%25D9%2586%25D9%2581%25D9%258A %25D8%25B0-%25D8%25B9%25D9%2582%25D9%2588%25D8%25AF%25D9%2587 %25D8%25A7-%25D9%2585%25D8%25B9-%25D8%25A7%25D9%2584%25D9%2583%25D9%2587