Municipality of Basra simplify construction procedure and granted leave by 1 day 8/24
Results 1 to 1 of 1

Thread: Municipality of Basra simplify construction procedure and granted leave by 1 day 8/24


    
  1. #1

    Municipality of Basra simplify construction procedure and granted leave by 1 day 8/24

    Municipality of Basra simplify construction procedures and granted leave by one day



    Alsumaria News / Baghdad - Municipalities began Basra simplify construction permit procedures and granted in one day instead of three months, indicating it is the first in this area and a citizen can get a license through the Internet.

    The Ministry of Construction and the municipalities in the statement Alsumaria News received a copy of it, that "the municipalities of Basra began granting leave for citizens wishing them within one day instead of three months," asserting "Shortcut method of granting leave from 13 steps to four steps to enable the citizen to get a degree in same day".

    She added, "This procedure has been under the direction of Minister of Construction and municipalities Tariq Kikhany," indicating that "Basra is the first municipality in this area after the entry of staff involved in the sessions focused on the simplification of procedures."

    He pointed out that "the citizen can get a license through the Internet and on the municipal site."

    The Ministry of Construction and Housing, confirmed earlier version of its intention to build on the basis of e-governance leaves, indicating that the World Bank would put new housing standards fit in with the residential reality in Iraq.


    https://translate.google.com/translate?sl=auto&tl=en&js=y&prev=_t&hl=en&ie=UTF-8&u=http%3A%2F%2Fwww.alsumaria.tv%2Fnews%2F144260%2F بلدية-البصرة-تبسط-إجراات-إجازة-البنا-وتم%2Far&edit-text=
    Last edited by Doodle Brain; 08-24-2015 at 09:44 PM.



Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •